Year: 2022
Site: Treatment plant of Porec (Croatia)
Our partnership with German company IST Anlagenbau GmbH allowed us to carry out this project in Porec, Croatia. Porec is situated on the west coast of the Istria by the Adriatic Sea. It is a popular tourist destination.
Information about the site:
2 greenhouses for drying sewage sludge
Dimensions of a greenhouse: 80 x 12 m
Number of extractors per greenhouse: 6
Flow of one extractor: 17,200 m3/h
Implemented odor treatment:
Installation of stainless steel micronization nozzles around each extractor:
6 nozzles per extractor
Flow rate per nozzle: 9 L / h
Each group of 6 nozzles can be opened or closed by a 316 stainless steel distribution valve.
A peripheral engineering solution (a high pressure pump, a dosing pump, etc.) is installed in galvanized steel cabinets.
Spraying of our odor neutralizer at low concentration (0.4%) adapted to the encountered odorous gazes eliminates odors right at the point of exit of the greenhouse.