News

20 February 2025

Composting platform in the Netherlands

Year: 2025 Site: Composting platform in the Netherlands In partnership with our distributor in the Netherlands, DUTCH ECO BLUE, we have equipped a composting platform in the Netherlands. The ...

Read more
20 February 2025

Automotive parts manufacturing plant in Spain

Year: 2024 Site: Automotive parts manufacturing plant in Spain In partnership with our distributor in Spain, BIOLFACTIVE, we have equipped a plant that manufactures parts for the automotive indust...

Read more
20 February 2025

Animal carcass meat residue recycling plant in Spain

Year: 2024 Site: Animal carcass meat residue recycling plant in Spain In partnership with our distributor in Spain, BIOLFACTIVE, we have equipped a plant that converts meat residues into protein...

Read more
23 September 2024

Plastic waste recovery plant in Spain

Site: In partnership with our exclusive distributor in Spain, BIOLFACTIVE, we have installed an odor treatment system at the “La Red de Veolia” site in Seville (Andalusia). Year: 2024 The si...

Read more
23 September 2024

Waste-to-energy plant in Switzerland

Location: Waste-to-energy plant in Switzerland Year: 2024 Our customer produces renewable electricity, district heating and climate-friendly biogas in the power plants of a major Swiss city. At ...

Read more
23 September 2024

Sorting and processing platform for household waste in the Normandy region

Site: Sorting and processing platform for household waste in the Normandy region Year: 2024 Odor treatment: Odor treatment of the household waste cell using dry-steam technology: installation...

Read more
29 April 2024

Animal protein production plant in Germany

Year: 2024 Site: In partnership with our German distributor, POLYCHEMIE (a subsidiary of the French SNF group), we have set up various treatments at a manufacturer based in northern Germany. This ...

Read more
29 April 2024

Soil decontamination project in the Normandy region

Year : 2024 Site : Earthmoving of soil polluted with VOCs on a former industrial wasteland in the city center. Site duration: 1 month Odor treatment implemented: In order to control the od...

Read more