Recycling and Waste Recovery Plant in the Grand-Est Region

Site: Recycling and Waste Recovery Plant in the Grand-Est Region


Year: 2022

Information:
Our client is a major player in the sphere of recycling and waste recovery.


Odor Treatment:

We have installed a high-pressure spraying ramp on the upper part of the building in order to control ammonia odors coming from the storage building. This treatment allows us to control and to reduce the odors that escape from the building (leaks).

The installation consists of 1 high-pressure spraying ramp of 100 m in stainless steel 316. The peripheral engineering solution is installed in a technical room. The system is controlled by a weather station.