Decontamination of a Construction Site in Clichy (2020)
Construction site: decontamination of a former hydrocarbon storage site.
Installation of an IDRAGEL ramp (85 plates) 250 m long in order to create a barrier between the source (excavation) and the closest dwellings (a distance of 15 m)