Site: Decontamination Site in the Provence-Alpes-Côte d’Azur region
Year: 2022
Information:
Soil decontamination of a former gas factory in downtown Toulon.
Odor Treatment:
We installed an odor barrier between the source (the excavation area) and the dispersion (local residents) in order to control odors during the excavation of polluted soil. This barrier consists of a high-pressure spraying ramp of 300 linear meters. High-pressure spraying of an odor neutralizer at low concentration allowed to control olfactive nuisances during the entire duration of the decontamination.