DS SMITH Paper Mill in Zarnesti (Romania)

Year: 2020

Installation of 2 additional odor treatment devices at the process water treatment plant.

  1. Deodorization of a biological pond (primary treatment). Installation of 140 m of high-pressure spray ramp around the pond.Industrial spraying of a low concentration odor neutralizer ensures odor neutralization at the source (pool).
  2. Treatment of sludge by incorporating a reagent in the dehydration process.The odor neutralizing reagent is incorporated at low concentration.This treatment ensures odor removal of the sludge for 5 days (storage in skips in a dedicated area) and deodorization of the process building.