Landfill site in Corsica

Site: Landfill site in Corsica  

Year: 2023 

Odor treatment: Following the extension of the site (capacity of 70 000 m3 / 45 000 t of waste per year) for a period of 15 years, we have set up a high pressure spraying ramp (the length is 300 m) in order to reduce the impact of the olfactory nuisances on the exploitation. 

The installed engineering solution consists of a 316 stainless steel high pressure ramp that feeds 200 spray nozzles. The nozzles are spaced 1.5 m apart and create an odor barrier between the source and the dispersion.