Site: non-hazardous waste storage facilities in the Bourgogne-Franche-Comté region.
Tonnage: 50 000 per year
Installation of a high-pressure ramp 135 m long in order to create an anti-odor barrier between the source (pit) and the dispersion (neighborhood).