Soil remediation site in the Normandy region

Year: 2024

Site: Earthmoving phase of soil polluted with VOCs on a former industrial wasteland in the city center. Site duration: 1 month

Odor treatment implemented :

To control the odors emitted during the earthmoving phases, we installed a mobile spraying system comprising 3 fans, each rated at 6,700 m3/h.

Each fan is equipped with 12 spray nozzles that create a fine aerosol to treat the malodorous gases escaping from the soil. The dosing system is mounted on a trailer to ensure mobility of the treatment. The odor neutralizer used is specifically adapted to the molecules present on-site and is dosed at a very low concentration: 0.12%.