Site: greenhouse for drying of sludge in a wastewater treatment plant in the Nouvelle-Aquitaine region.
Capacity: equivalent of 12 000 inhabitants
Installation of two dry vapor VS200 P cabinets supplying 3 bi-fluid nozzles in order to treat the contaminated air from the greenhouse at the source (inside the greenhouse) before extraction (fans).