Landfill Center in the Nouvelle-Aquitaine Region

Year: 2021

Data : 29 000 tons of waste per year

Odor treatment:

  • Installation of a 260m high-pressure stainless steel ramp. The spray nozzles are made of stainless steel and are placed at 1.5 m intervals.
  • High-pressure spraying of a low-concentration odor neutralizer on a part of the agricultural pit’s perimeter ensures deodorization at the source (pit) before any dispersion phase(residents)
  • The engineering solutions are controlled by a weather station.
  • Waste odor is eliminated only when the winds are unfavorable for the local residents.

This automatic control provides the customer with an optimized reagent consumption. The installation can also function using predefined time slots.