Bio Yvelines Services in Bailly (France)

3 September 2019

Composting platform 800m away from the Palace of Versailles next to highway A12 :

  • Capacity : 40 000 tons of green waste
  • WESTRAND installation in 2017
    • Two PR02 cannons using a dry vapour technique
    • Air treatment of leachate pools using an IDRAGEL ramp 200m long